Maru Piling was contacted by The Edge Developers to Install 270 Nos. Secant Piles on their plot boundary wall so as to retain the soil as they needed to excavate 15 meters below ground Level for basement parking.
This method was favorable because there was also a lot of inflow of Ground water and the piles also reduced this effect by almost 85%, making work easy and safe.